Feasibility study: Implementation of 20 MW steam electric boiler into a CHP plant, Czechia

Feasibility study: Implementation of 20 MW steam electric boiler into a CHP plant, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

The aim of the feasibility study was to evaluate the possibility of instalation of the steam electrode boiler into a CHP plant. The steam electrode boiler would be used for providing ancillary sevices as well as back-up heat source.

Location: Czechia

Dates of execution: 01/2021 - 04/2021

Technical specifications:

  • Steam electrode boiler output: 20 MW
  • Voltage: 10,5 kV