STEAM TURBINE GENERAL OVERHAUL, ČÁSLAV, CZECHIA

STEAM TURBINE GENERAL OVERHAUL, ČÁSLAV, CZECHIA
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We coordinate the general overhaul of the steam turbine (inc. gearbox and generator).

BFS Industry activities:

  • Owner's Engineering
  • Procurement
  • Coordination of suppliers

Location: Čáslav, Czechia

Execution: 11/2019 - ongoing

Technical specifications:

  • Steam turbine electrical power: 5 740 kW
  • Admission steam pressure: 62 bar(a)
  • Admission steam temperature: 480 °C