Biomass boiler, CHP Plant Dvůr Králové n. Labem, Czechia

Biomass boiler, CHP Plant Dvůr Králové n. Labem, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We developed the conceptual design, drew up the energy report and feasibility study on optimizing heat production during summer months in the local CHP plant. We developed  the basic design of the most appropriate solution – biomass boiler.

BFS Industry activities:

  • Optimizing the new energy source fuel, capacity and other parameters
  • Elaboration of conceptual design
  • Elaboration of energy report and feasibility study
  • Elaboration of basic design
  • Preparation of documents for co-financing application
  • Preparation of documents for building permit application
  • Preparation of technical specifications for tendering process

Execution date: 03/2015 - 10/2015

Technical specifications of the biomass boiler:

  • Fuel: agriculture pellets
  • Steam capacity: 5 t/h
  • Steam pressure: 9 bar(g)
  • Steam temperature: 185 °C