Procurement documentation and basic design: General reconstruction of waste incineration plant, Czechia

Procurement documentation and basic design: General reconstruction of waste incineration plant, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We prepared documentation for building permitting, co-financing application and general supplier procurement.

Location: Czechia

Execution dates: 01/2021 - 06/2021

Technical specifications:

  • Waste: dangerous waste with 5% of Chlorine
  • The amount of solid waste: 7 t/day
  • The amouont of liquid waste: 3,5 t/day