Documentation of the building permission: Coal boiler reconstruction for natural gas utilization, Most, Czechia

Documentation of the building permission: Coal boiler reconstruction for natural gas utilization, Most, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

Our company designed the documentation for building permitting of the project "Coal boiler reconstruction for natural gas utilization".

BFS Industry activities:

  • Designing building documentation

Location: Most, Czechia

Dates of execution: 02/2021 - 04/2021

Technical specifications:

  • Current boiler power output (coal): 110,8 MW
  • Reconstructed boiler power output (natural gas): 103 MW
  • Reconstructed boiler steam output: 140 tph