Electric Boiler 2 MW – Mutenice Greenhouse

Electric Boiler 2 MW – Mutenice Greenhouse
Owner's Engineer Design and Studies Installation and Supply Diagnostics

BFS Industry acted as Owner’s Engineer for the implementation of two low-voltage hot water electric boilers with a capacity of 2 × 1.2 MW for ancillary services at the Mutenice greenhouse site for bezDodavatele a.s. The project included the preparation of documentation at both the basic design and execution design stages in the areas of mechanical technology, low-voltage electrical systems, and measurement and control. The scope also included coordination with sub-suppliers of the civil engineering part and power connection. In addition, BFS Industry was responsible for supplying the technology, its installation, programming of control systems, and commissioning.

Technical parameters of the project:

  • Voltage level: 0.4 kV
  • Electric input: 2.4 MW
  • Output temperature: 90 °C
  • Maximum overpressure: 6 bar(g)

Role of BFS Industry in the project:

  • Owner’s Engineer
  • Design
  • Implementation
  • Programming
  • Commissioning