Steam, 30 MW, high voltage electric boiler, Pilsen, Czechia
Owner's Engineer |
Design and Studies |
Installation and Supply |
Diagnostics |
✓ |
✓ |
|
|
Our Company:
- prepared the project documentation for the mechanical (piping) part,
- in the role of Chief Project Engineer, coordinated the designers of the LV electrical, HV electrical, civil, and mechanical parts,
- took on the role of project manager for the mechanical, LV electrical, and civil parts,
- provided engineering services for construction (permitting),
- performed commissioning of the technology,
- programmed the automated control of the technology in a Simatic PLC,
- coordinated the certification of the technology for the provision of ancillary services.
Technical parameters:
- Electrical input of the electric boiler: 30 MW
- Electric boiler voltage: 10.5 kV
- Electrical input of the electric steam superheater: 1.9 MW
- Superheater voltage: 0.4 kV
- Steam overpressure: 1.18 MPa
- Superheated steam temperature: 260°C
- Certified ancillary services: aFRR, mFRR
Location: Pilsen, Czech Republic
01/2024 – 12/2025