We coordinated the reconstruction of the transport of fuel (biomass) to the boiler in the range from the operating storage tank to the downpipes of the K2 boiler. Due to the lack of suitable companies, ensuring the installation of the technology during the shutdown was executed with the help of the installation manager from our company, who collaborated with external locksmiths.

BFS Industry activities:

  • Owners engineering:
    • Designing
    • Delivery
    • Assembly
    • Commissioning

Location: Příbram, Czechia

Reconstruction: 06/2022 - 07/2022

Technical specifications:

  • The boiler output does not change.
  • Boiler steam output: 50 tp/hour