Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
We coordinated the designing, permitting and construction of closed cooling circuit modifications which resulted in its increased cooling capacity and therefore higher electrical power generation of the CHP plant during warm months. The cooling circuit was integrated into the existing technology.
BFS Industry activities:
“Brownfield” project
Construction: 04/2016 - 07/2016
Technical specifications of the cooling circuit: