District heating system, Hodonín, Czechia

District heating system, Hodonín, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We analyzed the possible approaches to low summer loads affecting existing CHP production and the district heating system.

BFS Industry activities:

  • Identifying and analyzing possible solutions to cover minimum summer heat loads of the local DHS.

Execution date: 10/2015 - 12/2015

Technical specifications of the CHP plant:

  • Two steam boilers with rated power 2 x 20 MW
  • Fuel: coal and natural gas
  • One steam boiler with rated power 13 MW
  • Fuel: light oil and natural gas
  • Steam parameters: 3,8 MPa(g), 320 °C