Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ |
Following the successful development of preliminary design, we have also prepared the technical specification for procurement of the turn-key supplier of the whole heat storage system. The heat storage system will be integrated into Riga CHP-2 plant in Latvia. The CHP plant consists of two CCGT units and five hot-water boilers and supplies heat into the district heating system of Riga.
BFS Industry activities:
Location: Riga, Latvia
Execution dates: 05/2018 - 07/2018
Technical specifications of the storage system: